| Date | Title | Description |
| Sign up to see | Sign up to see | Sign up to see |
| Oct 13, 2026 | Highway 1 culvert replacement east of Ely complete (Oct. 13, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation has completed culvert replacement work on Highway 1 about 7.6 miles east of Ely. MnDOT appreciates the public’s patience with schedule changes. This culvert was... |
| Oct 9, 2026 | I-35 in Duluth to close overnight Oct. 14 (Oct. 9, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be doing overhead work on the pedestrian bridge over I-35 just south of Mesaba Ave on the night of Oct. 14. The work will require a full closure of I-35 an... |
| Sep 23, 2026 | I-35 concrete grinding work in Duluth starts Sept. 28 (Sept. 23, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be starting concrete grinding work in the I-35 tunnels in Duluth on Monday, Sept. 28. Motorists can expect intermittent single lane traffic during work hou... |
| Sep 23, 2026 | Highway 1 culvert replacement east of Ely rescheduled to Sept. 24 (Sept. 23, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation has rescheduled culvert replacement work on Highway 1 located 7.6 miles southeast of Highway 1 in Ely or 0.7 miles northwest of the Birch River Dam to start Sep... |
| Sep 21, 2026 | Highway 1 culvert replacement east of Ely postponed to Sept. 28 (Sept. 21, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation has postponed culvert replacement work on Highway 1 located 7.6 miles southeast of Highway 1 in Ely or 0.7 miles northwest of the Birch River Dam until Sept. 28... |
| Sep 18, 2026 | Highway 10 Motley closes, detours at railroad crossing Sept. 21-25 (Sept. 18, 2026) | Latest news releases Highway 10 Motley closes, detours at railroad crossing Sept. 21-25
BAXTER, Minn.— Those who travel on Highway 10 in Motley, Morrison County, should plan for short-term delays and a detour as BNSF crews make repairs to t... |
| Sep 17, 2026 | Highway 15 detour south of Kimball Sept. 22-25 for railroad crossing repairs (Sept. 17, 2026) | Latest news releases
KIMBALL, Minn. – Canadian Pacific Kansas City (CPKC) railway will replace the railroad crossing surface on Highway 15 between Linden Avenue East and Willow Creek Road in Kimball starting Sept. 22, according to the Minne... |
| Sep 16, 2026 | I-35 southbound offramp to Highway 45 in Scanlon closed on Sept.(Sept. 16, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be closing the I-35 southbound offramp to Highway 45 in Scanlon the morning of Tuesday, Sept. 22 for paving work. A detour route will be posted. Work is cu... |
| Sep 16, 2026 | Twin Ports Interchange bridge inspections to take place Sept. 21-24 (Sept. 16, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be conducting routine bridge inspections at the Twin Ports Interchange next week. Motorists can expect lane and ramp closures between the hours of 9 a.m. a... |
| Sep 1, 2026 | Highway 61 tunnel work in Lake County resumes Sept. 8 (Sept. 1, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be resuming work on Highway 61 at the Silver Cliff and Lafayette Bluff tunnels north of Two Harbors in Lake County on Sept. 8. This work will finish replac... |
| Sep 1, 2026 | Highway 1 culvert replacement near Angora starts Sept. 8 (Sept. 1, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be replacing a culvert on Highway 1 located 4.1 miles east of the intersection with Highway 53 in Angora. Work is expected to take place September 8-25. Tr... |
| Sep 1, 2026 | Most state highways reopen in southwest Minnesota (March 16, 2026) | Latest news releases
WILLMAR, Minn. – (7:00 a.m.) The Minnesota Department of Transportation has reopened all state highways in southwest Minnesota District 8, with the exception of Highway 14. Highway 14 remains closed from Highway 71 west... |
| Aug 27, 2026 | Construction on Highway 75 Bridge in Climax to begin Sept. 14 (Aug. 27, 2026) | Latest news releases
BEMIDJI, Minn. – The Minnesota Department of Transportation will begin construction on the Highway 75 bridge in Climax on Sept. 14. The bridge has been closed since November 2025 after inspectors found additional moveme... |
| Aug 26, 2026 | I-35 in Duluth to close overnight Sept. 2 (Aug. 26, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be completing overhead work on the pedestrian bridge over I-35 just south of Mesaba Ave on the night of Sept. 2. This work will require a full closure of I... |
| Aug 26, 2026 | Traffic slowdowns expected week of Aug. 31 on westbound 16th Street SW near Highway 52 in Rochester for bridge repairs (Aug. 26, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists traveling west on 16th Street SW near Highway 52 in Rochester will experience traffic slowdowns beginning Aug. 31 as crews make bridge repairs, according to the Minnesota Department of Trans... |
| Aug 25, 2026 | Major roadwork on Highway 65 expands; construction spans two years (Aug. 25, 2026) | Latest news releases Detour extends north of Cambridge to Braham beginning Aug. 31
ST. CLOUD, Minn. – The Minnesota Department of Transportation will continue major improvements on Highway 65 between Cambridge and Braham, with construction ... |
| Aug 21, 2026 | Hwy 194 Mesaba Ave bridge repair closures extended (Aug. 21, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be continuing bridge repair work in the area of Highway 194 (Mesaba Ave), I-35 and Superior Street and will have additional traffic control changes on Aug.... |
| Aug 21, 2026 | Be alert for pavement preservation crews in northwest Minnesota (Aug. 21, 2026) | Latest news releases Motorists will experience short-term delays, lane closures and flagger operations
Bemidji, Minn. – The Minnesota Department of Transportation will begin a three-week pavement preservation project on the following highwa... |
| Aug 21, 2026 | Temporary detour of Highway 27 in Herman Aug. 24-Sept. 4 for railroad work (Aug. 21, 2026) | Latest news releases
DETROIT LAKES, Minn.—Motorists will encounter a temporary detour of Highway 27 in Herman starting Aug. 24 through Sept. 4, weather permitting, as railroad crews replace the railroad crossing, according to the Minnesota ... |
| Aug 21, 2026 | Nighttime work scheduled Aug. 25-28 at Highway 29 roundabout south of Alexandria for resurfacing (Aug. 21, 2026) | Latest news releases
DETROIT LAKES, Minn.—Motorists traveling on Highway 29 south of Alexandria can expect short delays overnight for three nights, beginning Aug. 25, as crews resurface the roundabout at the intersection of Highway 29 and C... |
| Aug 20, 2026 | Lane closures on I-35 near Owatonna begin Aug. 24 for resurfacing; expect traffic delays (Aug. 20, 2026) | Latest news releases
OWATONNA, Minn. – Motorists traveling on Interstate 35 south of Owatonna should be alert for lane closures in each direction and possible traffic delays beginning Aug. 24 as crews resurface the road, according to the Mi... |
| Aug 20, 2026 | West Superior St under Hwy 194 Mesaba Ave closes Aug. 24 (Aug. 20, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be continuing bridge repair work in the area of Highway 194 (Mesaba Ave), I-35 and Superior Street and changing traffic control on Aug. 24.
Superior Street... |
| Aug 20, 2026 | Highway 25 reopens north of Wright County Road 37 on Aug. 21 (Aug. 20, 2026) | Latest news releases Buffalo to Monticello roadwork
ST. CLOUD, Minn. – The Minnesota Department of Transportation will adjust traffic on Highway 25 between Buffalo and Monticello as crews move into the next phase of the 2026 project. Here’s... |
| Aug 18, 2026 | Hwy 43 detour in southern Fillmore County begins Aug. 24 for slope repair (Aug. 18, 2026) | Latest news releases Hwy 43 detour in southern Fillmore County begins Aug. 24 for slope repair
RUSHFORD, Minn. – Motorists on Highway 43 south of Choice in Fillmore County will be detoured for approximately one week beginning Aug. 24, while... |
| Aug 17, 2026 | Highway 73 Kettle River resurfacing open house Aug. 26 (Aug. 17, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation invites the public to attend an open house on Wednesday, Aug. 26, to receive updates on the planned 2029 resurfacing of Hwy 73 from the intersection with Hwy 27... |
| Aug 13, 2026 | I-35 in Duluth to close overnight Aug. 17 (Aug. 12, 2026) | Latest news releases I-35 in Duluth to close overnight Aug. 17
DULUTH, Minn. – The Minnesota Department of Transportation will be placing beams for the pedestrian bridge over I-35 just south of Mesaba Ave on the night of Aug. 17. The placem... |
| Aug 10, 2026 | Highway 14 and I-35 resurfacing near Owatonna begins Aug. 24 (Aug. 10, 2026) One-day Hwy 52 detour planned Aug. 14 to pour I-90 concrete bridge deck (Aug. 7, 2026) | Latest news releases
OWATONNA, Minn. – Motorists on Highway 14 and Interstate 35 motorists near Owatonna will experience lane and ramp closures beginning Aug. 24 as crews resurface the roads, according to the Minnesota Department of Transpo... |
| Aug 7, 2026 | Southbound Hwy 52 off-ramp turn lane changes begin at 2nd St SW in Rochester (Aug. 7, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists who exit Highway 52 southbound at 2nd Street Southwest in Rochester will have turn lane changes and may experience traffic congestion especially during peak travel hours, according to the Mi... |
| Aug 7, 2026 | One-day Hwy 52 detour planned Aug. 14 to pour I-90 concrete bridge deck (Aug. 7, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists on Highway 52 at Interstate 90 southeast of Rochester will be detoured for one day, Aug. 14, while construction crews pour the concrete bridge deck over the highway, according to the Minneso... |
| Aug 6, 2026 | Watch for workers on Highway 22 south of New Auburn starting Aug. 17 (Aug. 6, 2026) | Latest news releases
MANKATO, Minn. – Motorists are advised to use caution on Highway 22 near High Island Creek south of New Auburn beginning Aug. 17, as crews install rip rap (rock) to stabilize slopes and prevent erosion, according to the... |
| Aug 6, 2026 | Highway 194 Mesaba Ave bridge traffic control changes Aug. 10 (Aug. 6, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be continuing bridge repair work in the area of Highway 194 (Mesaba Ave), I-35 and Superior Street and changing traffic control on Aug. 10.
Starting on Mon... |
| Jul 30, 2026 | Highway 2 Bong Bridge onramp closure Aug. 5 (July 30, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be closing the Highway 2 Bong Bridge eastbound onramp from northbound I-35 on Wednesday, Aug. 5 to repair guardrail. A detour will be posted. Work is expec... |
| Jul 30, 2026 | Highway 169 Ely to Winton resurfacing work postponed to 2027 (July 30, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation has postponed the Highway 169 resurfacing work between Ely and Winton that was expected to begin in early August 2026 until summer 2027. This work is being resc... |
| Jul 30, 2026 | Expect traffic slowdowns Aug. 1 at southbound Highway 52-Civic Center Drive for bridge work in Rochester (July 29, 2026) | Latest news releases
ROCHESTER, Minn. – Southbound Highway 52 motorists in Rochester at the Highway 14/Civic Center Drive exits will see short-term ramp and lane closures beginning early Saturday, Aug. 1 as crews seal cracks and joints on b... |
| Jul 30, 2026 | Sturgis Motorcycle Rally travelers should stay alert for I-90 construction in southern Minnesota (July 29, 2026) | Latest news releases
ROCHESTER, Minn. –Motorcycle enthusiasts traveling in southeast Minnesota on Interstate 90 will encounter construction work zones as they travel west to the Sturgis Motorcycle Rally in South Dakota’s Black Hills, accord... |
| Jul 27, 2026 | One-day Highway 52 detour planned Aug. 4 for bridge beam setting at I-90 (July 27, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists on Highway 52 at Interstate 90 southeast of Rochester will be detoured for one day while construction crews set bridge beams over the highway, according to the Minnesota Department of Transp... |
| Jul 27, 2026 | Highway 6 construction between Outing and Remer starts Aug. 3 (July 27, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be starting construction on Highway 6 between Outing and Remer on August 3. Work includes resurfacing 17 miles of road, including shoulders and turn lanes,... |
| Jul 27, 2026 | Watch for workers on Highway 22 south of New Auburn starting Aug. 7 (July 27, 2026) | Latest news releases
MANKATO, Minn. – Motorists are advised to use caution on Highway 22 near High Island Creek south of New Auburn beginning Aug. 7, as crews install rip rap (rock) to stabilize slopes and prevent erosion, according to the ... |
| Jul 23, 2026 | MnDOT, State Patrol reminds WE Fest attendees of parking restrictions (July 23, 2026) | Latest news releases
DETROIT LAKES, Minn. – The Minnesota Department of Transportation, in cooperation with the Minnesota State Patrol, wants to remind WE Fest attendees that no parking is allowed along Highway 59 prior to noon on Monday, A... |
| Jul 17, 2026 | Traffic slowdowns expected week of July 20 on Highway 60 near Zumbro Falls and Highway 14 east of Rochester during sealing work (July 17, 2026) | Latest news releases
Traffic slowdowns expected week of July 20 on Highway 60 near Zumbro Falls and Highway 14 east of Rochester during sealing work
ROCHESTER, Minn. – Motorists traveling on Highway 60 from Zumbro Falls to Highway 52 and Hi... |
| Jul 15, 2026 | Highway 52 flyover ramp opens July 15 at Interstate 90 (July 15, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists on southbound Highway 52 turning onto eastbound Interstate 90 are now using the new flyover ramp at the interchange southeast of Rochester, according to the Minnesota Department of Transport... |
| Jul 15, 2026 | Lane closures in Rochester on 2nd Street SW and 6th Street SW bridges and Highway 52 bridges over Zumbro River scheduled July 18 for bridge improvements (July 15, 2026) | Latest news releases
ROCHESTER, Minn. – Motorists in Rochester on Second Street Southwest and Sixth Street Southwest bridges over Highway 52 and Highway 52 bridges over the Zumbro River will experience lane closures beginning early Saturday... |
| Jul 13, 2026 | I-35 northbound ramp to Mesaba Ave in Duluth to close July 9 (July 8, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be closing the northbound I-35 exit ramp to Hwy 194 (Mesaba Ave)/Superior St on Thursday, July 9 at 9 a.m. The closure will last until Friday, July 10 at 5... |
| Jul 13, 2026 | Blatnik Bridge lane closures in place for routine inspections (July 13, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be conducting routine bridge inspections on I-535 Blatnik Bridge starting on July 13. Motorists can expect a right lane closure Monday, July 13 through Thu... |
| Jul 9, 2026 | I-90 ramps begin closures, detours July 9 at Hwy 218 south bridge in Austin (July 8, 2026) | Latest news releases
AUSTIN, Minn. – Motorists using the Interstate 90 on- and off-ramps at the Hwy 218 south/21st St NE bridge in Austin near Austin Municipal Airport be detoured beginning Thursday, July 9, according to the Minnesota Depar... |
| Jul 6, 2026 | I-90 westbound to northbound Hwy 52 exit detour begins July 13 for ramp construction (July 6, 2026) | Latest news releases
ROCHESTER, Minn. – Westbound Interstate 90 motorists who want to exit to northbound Highway 52 to Rochester will be detoured beginning July 13 as construction crews realign the off-ramp, install box culverts and lightin... |
| Jul 6, 2026 | Traffic slowdowns on Highway 52 south of Chatfield July 7-8 due to drilling (July 1, 2026) | Latest news releases
CHATFIELD, Minn. – Motorists on Highway 52 south of Chatfield will experience traffic slowdowns July 7-8 while crews complete drilling work to prepare for construction next year, according to the Minnesota Department of... |
| Jul 4, 2026 | Overnight I-90 detour planned July 6 for Hwy 218 south bridge deck pour in Austin 7 (July 1, 2026) June 2026 Construction begins July 13 on Highway 59 at Adams Avenue in Mahnomen (June 30, 2026) | Latest news releases
AUSTIN, Minn. – Interstate 90 motorists will have an overnight detour Monday, July 6 while construction crews pour new concrete bridge deck on the Highway 218 south/21st St NE bridge in Austin near Austin Municipal Airp... |
| Jun 30, 2026 | Lane closures on I-90 near Worthington begin July 6 for upcoming bridge replacement project (June 30, 2026) | Latest news releases
MANKATO, Minn. – Lane closures on Interstate 90 near Worthington will begin July 6 as crews start preparing for bridge replacements along Interstate 90 in 2027-28, according to the Minnesota Department of Transportation... |
| Jun 18, 2026 | Hwy 194 Mesaba Ave bridge closure starts June 22 (June 17, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be starting bridge repair work in the area of Hwy 194 (Mesaba Avee), I-35 and Superior Street on Monday, June 22. The first stage of work will require a cl... |
| Jun 12, 2026 | MnDOT to host June 23 open house for Highway 11 construction in Greenbush (June 12, 2026) | Latest news releases MnDOT to host June 23 open house for Highway 11 construction in Greenbush
Highway 11 construction in Greenbush will begin on July 6
Bemidji, Minn. – The Minnesota Department of Transportation invites the public to an op... |
| Jun 4, 2026 | Pedestrian bridge demolition to close I-35 in Duluth the weekend of June 12 (June 3, 2026) | Latest news releases
DULUTH, Minn. – The Minnesota Department of Transportation will be replacing the pedestrian bridge over I-35 just south of Mesaba Ave starting the week of June 8. The bridge demolition will require a full closure of I-3... |
| Jun 4, 2026 | Construction on the Highway 11 Warroad River bridge resumes June 8 (June 4, 2026) | Latest news releases
Bemidji, Minn. – The Minnesota Department of Transportation announced that construction on the Highway 11 Warroad River bridge will resume on June 8. This two-year project includes replacing the bridge over the Warroad ... |
| Jun 4, 2026 | Traffic delays expected June 8-11 during Hwy 43 Winona bridge inspection (June 3, 2026) | Latest news releases
WINONA, Minn. — Motorists crossing the outbound Highway 43 Winona bridge will encounter lane closures and possible traffic slow-downs as crews inspect the Mississippi River bridge June 8-11, according to the Minnesota D... |
| Jun 2, 2026 | Blazing Star State Bike Trail closure begins June 2 for painting of I-35 bridges in Albert Lea (June 2, 2026) | Latest news releases
ALBERT LEA, Minn. – Bridge painting on Interstate 35 in Albert Lea will close the Blazing Star State Bike Trail and cause a lane closure beginning June 2, according to the Minnesota Department of Transportation.
The bik... |
| Jun 2, 2026 | Traffic delays expected June 3-4 during inspection of Wabasha bridge over Mississippi River (June 2, 2026) | Latest news releases
WABASHA, Minn. — Highway 60 motorists crossing the Mississippi River in Wabasha will encounter lane closures and brief traffic delays June 3-4 as crews inspect the bridge, according to the Minnesota Department of Transp... |
| May 29, 2026 | 14th Street NW to close, detour June 12 in Austin between I-90, 18th Avenue NW (May 29, 2026) | Latest news releases 14th Street NW to close, detour June 12 in Austin between I-90, 18th Avenue NW
AUSTIN, Minn. – Motorists in Austin using 14th Street Northwest north of Interstate 90 will be detoured beginning June 12 as construction cr... |
| Jun 23, 2024 | Flooding Continues to Impact Southeast South Dakota Causing Additional Road Closures (Friday, June 21, 2024 - Update #2) | For Immediate Release: Friday, June 21, 2024
Contact: Travis Dressen, Mitchell Region Engineer, 605-995-3300
INTERSTATE 29 ALTERNATE ROUTE UPDATE (Saturday, June 22, 2024 – Update #1, 7 a.m.)
The Interstate 29 alternate route from Sioux Fal... |